(Created page with "A blowdown valve can be configured on the “Output to Valve Selection” page above similar to other valves. The blowdown valve can be used with or without valve feedback, as detailed in the section on valve selection. To have the system use the blowdown valve automatically, the blowdown limit must be set. This can be found at “Settings” -> “Brain” -> “Outputs Setup” -> “Purge / Blowdown Alarm” or on newer versions at “Outputs Setup” -> “Blowdown...") |
No edit summary |
||
Line 5: | Line 5: | ||
[[File:Blowdown-vent.png]] | [[File:Blowdown-vent.png]] | ||
Note that there are several types of blowdown - using vent, using recycle, or using bypass. This page talks about the vent option | Note that there are several types of blowdown - using vent, using recycle, or using bypass. This page talks about the vent option. For the recycle option, see [[Blowdown With Recycle Sequence]]. | ||
*'''High Blowdown Limit on Startup''': This sets the suction reading limit before the unit needs to be blown down. For example, if set to 30 PSI, then if the unit is above 30 PSI suction on start up it will be blown down to below 30 PSI. | *'''High Blowdown Limit on Startup''': This sets the suction reading limit before the unit needs to be blown down. For example, if set to 30 PSI, then if the unit is above 30 PSI suction on start up it will be blown down to below 30 PSI. |
Revision as of 17:28, 21 November 2023
A blowdown valve can be configured on the “Output to Valve Selection” page above similar to other valves. The blowdown valve can be used with or without valve feedback, as detailed in the section on valve selection.
To have the system use the blowdown valve automatically, the blowdown limit must be set. This can be found at “Settings” -> “Brain” -> “Outputs Setup” -> “Purge / Blowdown Alarm” or on newer versions at “Outputs Setup” -> “Blowdown Settings”.
Note that there are several types of blowdown - using vent, using recycle, or using bypass. This page talks about the vent option. For the recycle option, see Blowdown With Recycle Sequence.
- High Blowdown Limit on Startup: This sets the suction reading limit before the unit needs to be blown down. For example, if set to 30 PSI, then if the unit is above 30 PSI suction on start up it will be blown down to below 30 PSI.
- Blowdown max time: This specifies the time limit for the blowdown. This catches the case where the blowdown valve doesn’t actually open.
- Vent after ESD Shutdown: If set to YES, then after an ESD alarm the vent will open. The valve will close when the alarm is cleared or reset is pressed.
The general blowdown logic is:
- Unit off: CLOSED
- On startup before prelube, if [Suction Pressure] > [Blowdown startup limit]:
- Go to Blowdown state
- Open valve for up to [max time] seconds
- Close valve when [Suction Pressure] < [Blowdown startup limit]
- During prelube, if [Suction Pressure] > [Blowdown startup limit]:
- Open blowdown again (in case pressure equalized to above the blowdown limit)
- Close blowdown once below the limit
- Unit running: CLOSED
- After shutdown, if an auto restart is possible:
- Blow down if needed
Also, the blowdown will be open/closed during the purge sequence if used.