Unit Test Callouts and Data Polls

From EMIT Controls
Revision as of 18:49, 30 July 2024 by Thomas Peterson (talk | contribs) (Created page with "== Overview == On the telematics portal you can send two types of test messages to a unit- request for test callout and request for immediate data send. These tests are found by selecting a unit then navigating to the "Callout Scheduling" dropdown followed by "Test Callout". File:Test callout1.png == Test Page == The test page has two test buttons and a list of messages that have been sent. File:Test msg list.png In the message list it will show a list of p...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Overview

On the telematics portal you can send two types of test messages to a unit- request for test callout and request for immediate data send. These tests are found by selecting a unit then navigating to the "Callout Scheduling" dropdown followed by "Test Callout".

Test callout1.png

Test Page

The test page has two test buttons and a list of messages that have been sent.

Test msg list.png

In the message list it will show a list of previous messages that have been sent to a device. Each row is one message. The "Sent" column shows the date and time the message was sent. The "Acknowledged" column will show the date and time the device (DCT or EDR) sent back a message saying that the original message was received.

The Test Callout button will request the unit to send a test callout. After it is acknowleged you will find the test callout in the Alerts tab. Within a minute of the message acknowledgement the callouts should be received. Note that this still requires that the callout list is actually set up - see the "Callout Scheduling" - "Overview" tab to make sure the correct people can be notified.

The